Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

Panel
Panel
Panel
  • Call on September 10 September 17
    • Reviewe-signatures Pilotsfor Risk Assessment
      • Pilot A (NPS)
      • Pilot B (e-log)
      • Pilot C (fish/trip ticket)
      • Pilot D (if needed)
    • Review Criteria for Pilot Evaluation

...