Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

Panel
  • Call on August 27
    • ThinkTank Session on Alternative Analysis
    • Map e-signature alternatives to OMB assurance levels 
    • Likely Criteria
      • Risk Mitigation 
      • Usability
      • Maturity (Ease of Implemenation)
      • CostAffordability
Panel
  • Call on September 10
    • Review e-signatures Pilots for Risk Assessment
      • Pilot A (NPS)
      • Pilot B (e-log)
      • Pilot C (fish/trip ticket)
      • Pilot D (if needed)
    • Review Criteria for Pilot Evaluation

...